SiT9025

Spread-spectrum oscillators (SSXO)
Spread-spectrum timing options. Match the spread mode and modulation depth to your system.
PDF · 0.85 MB · 14 pages
| Frequency | 1MHz -150 MHz |
|---|---|
| Frequency stability | ±25 ±50 ppm |
| Output | LVCMOS |
| Supply voltage (V) | 1.8, 2.5 to 3.3 |
| Temperature range (°C) | -40 ~ 85 (Gr. 3) -40 ~ 105 (Gr. 2) -40 ~ 125 (Gr. 1) -55 ~ 125 (Ext. Cold Gr. 1) |
| Package dimensions (mm) | 2.0x1.6 2.5x2.0, 3.2x2.5 |
| Spread mode | Triangular, Hershey Kiss , Random |
| Spread percentage (%) | Center: ±0.125 to ±2.000, Down: -0.25 to -4.00 |
| Rise/fall time (ns) | Configurable to reduce EMI |
Ranges cover different ordering options; not every combination is available. Interpret jitter and phase noise using the datasheet test conditions.
Related applications
Automotive Cameras
Automotive Cameras:Timing considerations for Automotive Cameras. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →ADAS Computer
ADAS Computer:Timing considerations for ADAS Computer. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Infotainment/Cluster
Infotainment/Cluster:Timing considerations for Infotainment/Cluster. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Battery Management System
Battery Management System:Timing considerations for Battery Management System. Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Energy Storage Systems (ESS)
Energy Storage Systems (ESS):Timing considerations for Energy Storage Systems (ESS). Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Servo Drives
Servo Drives:Timing considerations for Servo Drives. Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Automotive ECU
Automotive ECU:Timing considerations for Automotive ECU. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Driver Monitoring System
Driver Monitoring System:Timing considerations for Driver Monitoring System. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Smart Mirrors
Smart Mirrors:Timing considerations for Smart Mirrors. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Automotive LiDAR
Automotive LiDAR:Timing considerations for Automotive LiDAR. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Computer Numerical Control
Computer Numerical Control:Timing considerations for Computer Numerical Control. Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Autonomous Ground Vehicles (AGVs)
Autonomous Ground Vehicles (AGVs):Timing considerations for Autonomous Ground Vehicles (AGVs). Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Mining and Construction Equipment
Mining and Construction Equipment:Timing considerations for Mining and Construction Equipment. Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Industrial Autonomous Ground Vehicles (AGVs)
Industrial Autonomous Ground Vehicles (AGVs):Timing considerations for Industrial Autonomous Ground Vehicles (AGVs). Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →EV Charging
EV Charging:Timing considerations for EV Charging. Coordinate sensing, computing, control and vehicle connectivity. Review interface, temperature and system reliability requirements.
View details →Data checked: 2026-10-26
