SiT9375

Differential oscillators
Differential output options for high-speed systems that require differential clocks.
PDF · 2.58 MB · 33 pages
| Frequency | 25 MHz-644.53125 MHz ; 31 fixed frequencies |
|---|---|
| Frequency stability | ±20 ±25 ±30 ±50 ppm |
| Output | LVPECL/LVDS/HCSL Low-power HCSL/FlexSwing |
| Supply voltage (V) | 1.8,2.5,3.3 1.71~3.63, 2.25~3.63 |
| Temperature range (°C) | -20 ~ +70,-40 ~ +85 -40 ~ +95, -40 ~ +105 |
| Package dimensions (mm) | 2.0 x 1.6,2.5 x 2.0 3.2 x 2.5 |
| RMS integrated phase jitter | 200fs |
Ranges cover different ordering options; not every combination is available. Interpret jitter and phase noise using the datasheet test conditions.
Related applications
SmartNICs
SmartNICs:Timing considerations for SmartNICs. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →Fronthaul Switches
Fronthaul Switches:Timing considerations for Fronthaul Switches. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →Top of Rack Switch / Leaf Switch
Top of Rack Switch / Leaf Switch:Timing considerations for Top of Rack Switch / Leaf Switch. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →Factory Automation
Factory Automation:Timing considerations for Factory Automation. Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Optical Modules
Optical Modules:Timing considerations for Optical Modules. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →Industrial Robotics
Industrial Robotics:Timing considerations for Industrial Robotics. Timing for industrial control, measurement, energy and field equipment. Consider synchronization, environment and long-term operation.
View details →Fixed Wireless Access (FWA)
Fixed Wireless Access (FWA):Timing considerations for Fixed Wireless Access (FWA). Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →Host Bus Adapter
Host Bus Adapter:Timing considerations for Host Bus Adapter. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →PAM4 for High-Speed Links
PAM4 for High-Speed Links:Timing considerations for PAM4 for High-Speed Links. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →FPGA Clocking
FPGA Clocking:Timing considerations for FPGA Clocking. Timing and synchronization for wireless networks, data centers and high-speed links, with attention to jitter budgets and clock planning.
View details →Data checked: 2026-10-26
